Saturday 2 March 2013

Cherryburn Nature Scape



After the Wednesday group had made a start the previous day it was time for the Thursday group to turn their hand to building the Cherryburn Nature Scape. Rob the Ranger at Cherryburn had come up with the design and we were helping him build it.



Along with some other jobs that needed doing around the site, the team were soon getting stuck in.




















The day soon ended and we had managed to get everything done. Lots of fun was had by the team building the play scape, I just hope the children enjoy playing on it as much. 

No comments:

Post a Comment